• A+

  • A

  • A-

MINNYGAP WIND FARM

Minnygap Wind Farm became fully operational in spring 2017.

Comprising of 10 turbines measuring up to 125m high to the tip of the blade, the wind farm has a total installed capacity of approximately 25 MW. 

Site Location

Minnygap

Contains Ordnance Survey Data © Crown Copyright and Database Right 2014. Ordnance Survey 0100031673